An office move should help people find the resources they need in the new workplace. Furniture transport is one stage, while the return to work also depends on access, IT connections and workstation setup. A shared plan connects the internal coordinator, building managers, technical suppliers and moving team. It should show what happens first, who makes decisions and how completion will be checked.
Decide what needs to work first
Identify activities that can pause and those that need continuing access. Reception, sales and administration may have different requirements. Set priorities for desks, rooms and equipment, then have the relevant managers approve the order. Without that agreement, each department may expect its own boxes to arrive first.
Consider temporary working arrangements where your organisation can support them. Their usefulness depends on available tools and internal policies. Estimate the move from the actual inventory, access and requested tasks. A weekend move does not by itself guarantee that every system will be ready on Monday morning.
Give each responsibility a clear owner
Appoint one person to coordinate decisions and a contact for each department. Separate transport, packing, dismantling and IT recommissioning. The moving company does not automatically provide disconnection, configuration or technical testing of equipment. Agree those boundaries before the quotation is finalised.
Keep a contact list for the transfer, including the people responsible for keys, badges, passenger lifts and delivery access. Everyone should know how to report a problem and who can authorise a change. If the coordinator is unavailable, identify a deputy who can make timely decisions.
Connect the inventory to the destination layout
Assign an identifier to each workstation or furniture group. Use it consistently on boxes, equipment and the new floor plan. For example, B12 can connect a desk, chair and two cartons to a particular position without displaying an employee’s full name.
Separate items being moved from those staying in storage or going through an appropriate disposal route. Decisions about records and archives should be approved by the person responsible for them. Loading time is a poor moment to decide which business documents can be discarded.
Plan IT handling with the technical provider
Ask your IT provider to define disconnection, transport preparation and recommissioning. Have backups checked under your organisation’s procedures before any intervention. Identify equipment requiring specialist packaging or handling so it is not treated as an ordinary office carton.
Label cables and photograph connections where your policies allow it. Sensitive records and storage devices should follow the organisation’s instructions for containers, access and handover. Avoid labels that unnecessarily expose confidential information. Agree who records receipt of equipment when responsibility changes.
Arrange access and delivery in the right sequence
Confirm permitted hours in both buildings, lift dimensions and loading possibilities. Where several teams are moving, organise batches in the intended installation order. Delivering boxes directly to their assigned locations avoids repeated handling after the moving team has left.
Check that the receiving areas are ready: necessary work completed, doors accessible, destinations identified and circulation routes clear. A delivery can be physically possible even when the intended work area is not yet usable. Build that readiness check into the plan.
A transfer example for a small team
A twelve-person company moves from the European Quarter to Auderghem. Reception and four workstations have priority. The coordinator identifies the associated boxes and confirms the recommissioning order with the IT provider. Other furniture is grouped by destination zone.
At delivery, one representative directs placement and another records inventory discrepancies. The return to work is approved after the agreed checks on essential equipment, connections and access. This separates the confirmation of delivered goods from the confirmation that business systems operate.
Return to work checklist
- Share the floor plan and identification codes.
- Confirm decision-makers and useful contact details.
- Agree handling arrangements for sensitive records.
- Schedule technical work with the IT provider.
- Coordinate building access and loading space.
- Define the checks needed by each department.
Frequently asked questions
Does everything have to move on the same day?
That depends on the premises and business activity. A phased move can be considered, with the dependencies and cost of each stage clearly assessed.
Should staff pack their own desks?
Agree the division of work. Staff may prepare certain belongings, while fragile equipment and heavy items can need dedicated handling.
Who signs off the return to work?
The project owner coordinates approval with the relevant teams and technical providers. Delivery and technical readiness are separate checks.